We currently concentrate on the following:
- Wind Farm Electrical Collection Systems - complete design and installation of electrical collection
systems including trenched underground cable, transformers and tower wiring.
- Specialty Lighting Projects
- Installation of roadway lighting systems for interstate, state & county highways and residential neighborhoods.
- Sports lighting for school, recreational and professional sporting venues.
- Commercial lighting systems including shopping center parking lots.
- Airport Lighting and Navaids - parking and runway illumination, aircraft taxi lighting and navigational
aid systems for commercial and general aviation airports.
- ITS Projects - CTCV systems, changeable messages systems, traffic county systems.
- Traffic Signal Systems - installation of traffic signal networks associated with larger intersections
and multiple time-sequenced traffic lights and traffic surveillance cameras.
- Highway Signing - installation of illuminated highway signs including variable message signs.
- Directional Boring - installation of underground electrical cable, fiber and telephone for all of the
above referenced installation services.
|
|
RECENTLY COMPLETED PROJECTS INCLUDE:
Nobles Wind Project, Minnesota - 201 MW (11/2010)
-
424,641 Circuit Feet 35KV Cable Installed
Fowler Ridge II Wind Project, Indiana - 285 MW (11/2009)
- 326,521 Circuit Feet 35KV Cable Installed
Hoosier Wind Project, Indiana - 106 MW (10/2009)
- 150,924 Circuit Feet Cable Installed
- 53 Repower Turbines Wired
- 69KV/34.5KV 5 Circuit Substation Installed
Carroll Wind Project, Iowa - 150 MW (12/2008)
- 424,595 Circuit Feet 35KV Cable Installed
- 100 GE Turbines Wired
Pomeroy III Wind Project, Iowa - 58.5 MW (9/2008)
- 116,750 Circuit Feet 35KV Cable Installed
- 39 GE wind Turbines Wired
Endeavor II Wind Project, Iowa - 50 MW (7/2008)
- 79,268 Circuit Feet 35KV Cable Installed
Camp Grove Wind Project, Illinois - 150 MW (11/2007)
- 291,366 Circuit Feet 35KV Cable Installed
- 100 GE Wind Turbines Wired
Intrepid Wind Project, Iowa - 150 MW (11/2004)
- 167,419 Circuit Feet 35KV Cable Installed
|
|
CURRENT PROJECTS IN PROGRESS:
White Oak Wind Project, Illinois - 150 MW
- 223,506 Circuit Feet 35KV Cable
Timber Roads II Wind Project, Ohio - 149.4 MW
- 347,311 Circuit Feet 35KV Cable
- 83 V-100 Vestas Turbine Wiring
|
RECENTLY COMPLETED PROJECTS INCLUDE:
- City of Silvis, Illinois - Street lighting improvements
- Abraham Lincoln Capital Airport, Illinois (IDOA) - Install runway guard lights
- ISTHA I-355 North-South Tollway (Plaza 91 to 95) - Installation of lighting, CCTV, dynamic message signing, and RTMS electrical work stations
- Cook-Will Counties, Illinois (IDOT) - Installation of roadway lighting on I-57
- Stark County, Illinois (IDOT) - Installation of decorative lighting
- Galesburg Municipal Airport, Illinois (IDOA) - Replace rotating beacon and beacon tower
- Waukegan Regional Airport (IDOA) - Replace airport beacon and tower
|